CONCRETE PAVEMENT DEMOLITION
Stomper Demolition
Co., Inc. has a large variety of equipment to meet your
pavement demolition needs.
- WHIPHAMMER- A versatile machine that averages
approximately 300 SY per hour on flat surfaces of 6" pavement.
It is capable of breaking up to 12" pavement. (For large flat
areas over 900 SY we recommend the Guillotine Breaker.)
Averages per hour are affected by: # of areas, thickness of
pavement, pavement marked and sawcut (if necessary) before Stomper
arrives, areas cleared of vehicles or debris.

Bridge Deck
Bridge
Rail
Service Station Tank Slabs
|
- GUILLOTINE BREAKER- 12,000 lb 8' wide guillotine
style hammer that can cycle up to 30X per minute. Requires a
flat, 8' wide working surface accessible by a pneumatic tire truck.
Break size is set by technician and can vary from rubbleized up to 24"
break pattern or larger if requested by contractor.
This machine is a true work horse and can rubbleize up tp 5,000 SY
of 8" pavement in a 12 hour day. The guillotine can break up to
36" or thicker pavement and easily handles airport runways. On rare
occasions it has tackled solid rock.
Rubbleizing Highway


Rubbleized Product
6" break pattern 6-12" break pattern
|
A key benefit to rubbleizing versus 18-24" break size is that rebar is
delaminated from the concrete which allows recycling of concrete AND
the steel. The rubbleized concrete has much higher
trucking yields = reduced trucking costs that reduce the overall
expense of your projects. Many of our contractors
reuse the rubble as road base which saves them even more.
|
|
 |
 |
|
Komatsu raking the rebar out |
Rebar that
has been raked out of the rubble for steel and concrete recyling.
|
|
|
|

|
|